Investor relations·Growth round 2026

KiteX – the future of small wind energy

Efficiency is at the heart of everything we do. The next funding round will bring the KiteX designs to many more sites, helping the energy transition, building rural resilience and making small wind turbines profitable across most geographies.

2 patentsDesigned and built in Denmark2028 waitlist open
100
Pre-orders
2027 production sold out
9.9 M DKK
Public grant
Energy Technology Development and Demonstration Programme (EUDP)
40,000+
Verified sites in Denmark
~25 million potential sites beyond Denmark
Up to 13×
Mass reduction
vs. conventional small wind turbines
Why invest

Built to make small wind profitable

TWT-11 prototype in field testing, with utility-scale turbines behind it TWT-11 prototype in field testing
Why now
2027
Production sold out

Final stage of type certification

KiteX is at the final stage of securing a full type certificate for the TWT-11. 2027 production is sold out, and we are raising new capital to scale production to meet demand.

Technology
2
Patents

Intellectual property

KiteX has developed all core technologies in-house, from embedded systems design to blade manufacturing, and secured two high-value patents in the process.

Funding
14.9 M DKK
Grant and private capital

Previous funding

The TWT-11 project started with a 9.9 million DKK EUDP grant and 5 million DKK in private capital to design and develop the concept. The first customer turbines are delivered in 2027, and 2028 has a waitlist.

Market
~25 M
Potential sites

Market outlook

Over 40,000 verified sites in Denmark alone. Beyond Denmark we have identified approximately 25 million potential customer sites, many of which would benefit from more than one TWT-11.

I started the company to bring affordable, year-round reliable energy to farms and countryside homes, and the TWT-11 does just that.
Andreas Okholm Andreas OkholmFounder & CEO
White paper

Why small wind failed – and what changes everything

Read the full white paper by our CEO and CTO, Andreas Okholm.

Backed by

Public and industry partners

What Our Investors Say

"Interesting technology meets financial viability. With the TWT-11 KiteX demonstrates that it is possible to capture wind energy when electricity prices are at their highest."

Cyriel de Jong
Cyriel de Jong

Investor in KiteX - CEO at KYOS

"KiteX has the potential to revolutionize small wind turbines, making it profitable for many types of customers to tap into clean reliable energy!"

Anders Fauerskov
Anders Fauerskov

Early Investor - Chairman of the Board

"The TWT-11 is a unique design which presents a unique value proposition. Making small wind turbines easy to manage and profitable is a game changer."

Santosh Govindaraju
Santosh Govindaraju

Sustainability Leader - Member of the Board

"It is exciting to come across a well engineered product with such potential. KiteX has all the right engineering capabilities in-house to enable deployment at scale of the TWT-11. "

Ross Box

Angel Investor - CEO at Tuned Engineering

Who you'd be backing

Andreas Okholm

Andreas Okholm

Founder & CEO

LinkedIn

Founder and maker at heart. Andreas has worked with design, engineering and production in his own companies after concluding his masters degree. Founded and scaled Vaavud before starting KiteX where the first focus was on advanced aerial wind turbines.

Background M.Sc. in Engineering - Mechanics
Frederik Skovgaard

Frederik Skovgaard

COO

LinkedIn

Leads the daily operations side of the business. Experienced developer from years in audio and satcom industries.

Background M.Sc. Engineering - Design & Innovation
Oliver Larsen

Oliver Larsen

Turbine Technician

LinkedIn

Oliver brings vast experience from drone design and manufacturing along with his educational background as operation and maintenance engineer. In charge of customization and continuous optimization of our 3D printers.

Background Operations and Maintenance Engineer
Ulises Lisiuk

Ulises Lisiuk

Turbine Technician

LinkedIn

Ulises brings vast experience from the oil and gas industry along with a knack for making things work. In charge of production setup at the HQ along with health and safety.

Background Oil and Gas - MWD Field Specialist

Milestones

From the first EUDP-funded design work to a sold-out 2027.

2024

TWT-11 Project Kick-off

Scoping and early design, EUDP funding

2025

Early investors joining

2026

Growth round and type certification

Raising the round that scales production and completes International Electrotechnical Commission (IEC) type certification

2027

First deliveries, sold out

All 2027 installation capacity reserved by 100 pre-orders; 2028 waitlist open

Read More
How to invest

Talk to us

Email investors@kitex.tech and we will get the process started.

Team

Meet the core team

Beyond an experienced investor team, the engineering foundation of KiteX is solid.